Concrete joint repair work is scheduled to begin on East State Street on May 7, 2018. The work will take place between Cook Drive and Della Drive. The Contractor will be temporarily closing one lane on East State Street during the day (Monday - Friday). Temporary traffic control will be in place and two-way traffic will be maintained. The lane will be re-opened each evening.
Questions or concerns may be addressed to the Engineering and Public Works Department, 740-593-7636.